Jetty
- Designed cargo handling capacity – 9 million tons (@ 50% occupancy)
- 3 nos. 16”marine loading arms each with capacity of 3250m3/hr flow rate
- Jetty berthing capacity 25,000-75,000dwt vessels
- Mooring hooks

LNG Trestle
- 36” pipeline for handling HSFO
- 30” pipeline for handling HSD/PMG
- 30” pipeline for handling RLNG
- Available additional capacity for 3 more pipelines

LNG Jetty
- Floating Storage Regasification Unit – 173,000m3
- Two marine loading arms
- Scada System
- Ship to Ship unloading operations
- 14km RLNG transmission pipeline
- Pipeline capacity – 1.2bcfd
- RLNG metering control system

Storage Terminal Project
- Storage terminal capacity – 108,000M.ton (6 tanks, 18,000M.ton each)
- Truck loading gantry – 14 nos.
- Two way loading operations – shore to ship and vice versa
- Fully Integrated with Oil Terminal for efficient and safe unloading operations at high flow rates

Pipeline
- Pipeline transports residual fuel oil from Oil Terminal to Power Station
- 82km pipeline
- Designed throughput: 3.2 million mt per annum