Jetty

  • Designed cargo handling capacity – 9 million tons (@ 50% occupancy)
  • 3 nos. 16”marine loading arms each with capacity of 3250m3/hr flow rate
  • Jetty berthing capacity 25,000-75,000dwt vessels
  • Mooring hooks

LNG Trestle

  • 36” pipeline for handling HSFO
  • 30” pipeline for handling HSD/PMG
  • 30” pipeline for handling RLNG
  • Available additional capacity for 3 more pipelines

LNG Jetty

  • Floating Storage Regasification Unit – 173,000m3
  • Two marine loading arms
  • Scada System
  • Ship to Ship unloading operations
  • 14km RLNG transmission pipeline
  • Pipeline capacity – 1.2bcfd
  • RLNG metering control system

Storage Terminal Project

  • Storage terminal capacity – 108,000M.ton (6 tanks, 18,000M.ton each)
  • Truck loading gantry – 14 nos.
  • Two way loading operations – shore to ship and vice versa
  • Fully Integrated with Oil Terminal for efficient and safe unloading operations at high flow rates

Pipeline

  • Pipeline transports residual fuel oil from Oil Terminal to Power Station
  • 82km pipeline
  • Designed throughput: 3.2 million mt per annum